Suez Knowsley
The Challenge
SUEZ UK was due to complete a mandatory 10-year inspection and refurbishment of a 1 million litre fire water storage tank at one of its facilities, including a full drain-down and replacement of the internal lining.
In an industry where fire incidents can occur several times each week, maintaining continuous fire protection is critical and a prolonged shutdown of the facility is not possible due to the nature of the business in processing waste.
The Solution
Working within a restricted area, Exsel Pumps engineered a complete temporary fire water solution, including the installation of 12 x 70,000-litre temporary storage tanks.
To maintain SUEZ’s existing fire suppression infrastructure, Exsel designed and fabricated a bespoke 250 mm flanged tee.
Using a 6-inch road tow pump, the existing fire water was transferred from the permanent tank into the temporary storage system before refurbishment works began, allowing the water to be retained and reused.
Once the works were complete, the stored water was pumped back into the permanent tank, enabling the system to be returned to normal operation.
The Outcome
By maintaining full fire protection throughout the works, Exsel Pumps enabled SUEZ to continue operating safely while avoiding any shutdowns to the facility.
Key Results
- 1 million litre fire water storage tank successfully refurbished
- 12 x 70,000-litre temporary tanks installed and integrated
- 0 days of operational downtime
- 100% fire protection availability maintained throughout the project
- Existing fire water retained and reused
- Zero incidents during project delivery