Fareham Emergency
The full installation was carried out by the Exsel Team utilising 450mm diameter flanged steel pipework that provided a secure tamper-proof and leak-free solution. Using this size of pipework reduced the number of pipe runs. The installation Team worked overnight to ensure the over pump capability was set up and ...
Case Studies
River Overpump for New Bridge Installation
The project was to supply and install two huge submersible/immersible L12K pumps, with each pump capable delivering 1,000 L/sec at a 10 m head. The pipeline consisted of Individual 450mm suction and discharge lines that were installed across the site. At the end of each delivery line, special care ...
Case Studies
East Worthing Storm Pump
Exsel Pumps responded to an emergency request to look at a major problem faced at East Worthing Works. It soon became obvious the scale and complexity of the problem. The initial problem was the failure of the storm pumps for the works and a system had to be put in ...